SpaceFish Project
RSS icon Email icon Home icon
  • Finishing the mock-up and preparing the little bexus.

    Posted on April 15th, 2009 noether 4 comments

    Today was an exciting day. The mock-up is closer to be finished, people from Astilleros Venturi did a great job crafting all the pieces from the molds.

    SpaceFish Team and Astilleros Venturi

    SpaceFish Team and Astilleros Venturi

    SpaceFish

    SpaceFish

    Now is time to pay attention to the details, placing the rudder, the motor, electronics… all have to be with precision to respect the center of gravity and stability of the SpaceFish.

    Determing the best placement for the parachute

    Determining the best placement for the parachute

    Also, we are making our own little gondola, with this angle to provide a ramp to drop the SpaceFish, from our meteorological balloon. Performing several tests the next month, all have to be ready before the real BEXUS campaign next October.

    Gondola with take off ramp

    Gondola with ramp

     

    4 responses to “Finishing the mock-up and preparing the little bexus.” RSS icon


    Leave a reply